I built this house for a customer who lives along the Blanco River in Wimberley. An old house on the site was demolished to build this custom house on piers above the 100 year flood plain. Sadly, the Memorial Day flood of 2015 passed the 100 year flood plain by 6 feet and water was 4 feet deep inside the house. The house was structurally unaffected by the flood but required a total first floor flood renovation. The water rose above the hand rails on the porches and up to the light switches on the first floor. Many of the neighboring houses were totally wiped away in this flood. All the hardie material was ripped off the bottom and the a/c compressors floated off the platform. The interior/exterior has been restored back to pre-flood condition.